Cutright & Prihoda, Inc. | Lumberton Stadium / Press Box
cutright, allen, brad, dean, architect, architecture, building, construction, engineering, FEMA, education, track and field, track, field, school, medical, liturgical, not for profit, NFP
15976
portfolio_page-template-default,single,single-portfolio_page,postid-15976,ajax_fade,page_not_loaded,,qode-theme-ver-10.1.1,wpb-js-composer js-comp-ver-6.13.0,vc_responsive
 

Lumberton Stadium / Press Box

Date
Category
Education
About This Project
This project involved the reversal of the home and visitor seating areas, a new press box and the addition of 2,400 seats on the home side. New handicap codes allowed the press box to be approximately 600 square feet in area, without the need for an elevator. Also included in this project were new electrical systems for the sound system, a time clock, a score board, handicap parking and new fencing.

Repair and replacement of existing seating components

 

Addition of handicap seating spaces within the bleachers along with a new walkway platform

 

• Addition of 800 moulded seats for season ticket holders and VIPs

• A new 8-foot by 60-foot press box with zero mullion at the 50-yard line and
filming deck
• Press box wired for sound, computer and field control systems
• Custom façade around the press box to reflect school colors and incorporate
the Raider logo